Estimating Location-Adjustment Factors for Conceptual Cost Estimating Based on Nighttime Light Satellite Imagery
Author(s): |
Su Zhang
Susan M. Bogus Christopher D. Lippitt Giovanni C. Migliaccio |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, January 2017, n. 1, v. 143 |
Page(s): | 04016087 |
DOI: | 10.1061/(asce)co.1943-7862.0001216 |
- About this
data sheet - Reference-ID
10170901 - Published on:
02/12/2018 - Last updated on:
02/12/2018