0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10700291
  • Published on:
    11/12/2022
  • Last updated on:
    15/02/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine