Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects
Author(s): |
Peter E. D. Love
Chun-Pong Sing Brad Carey Jeong Tai Kim |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Infrastructure Systems, June 2015, n. 2, v. 21 |
Page(s): | 04014035 |
DOI: | 10.1061/(asce)is.1943-555x.0000221 |
- About this
data sheet - Reference-ID
10574989 - Published on:
27/02/2021 - Last updated on:
27/02/2021