0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes

This publication lists 30 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10385582
  • Published on:
    24/11/2019
  • Last updated on:
    24/11/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine