Ersatzneubau für die Schnettkerbrücke in Dortmund: Bauausführung (Teil 2)

Author(s):



Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 3, v. 82
Page(s): 188-195
DOI: 10.1002/stab.201301655
Abstract:

Replacement of the Bridge Schnettkerbrücke in Dortmund: Building of the bridge (part 2).

The replacement of the Bridge Schnettkerbrücke started with the assignment of the construction company Schachtbau Nordhausen GmbH in September 2005. It was quickly to realize, that the building of this technical and optical ambitious bridge was a great challenge for all participants.
The erection had to take place under difficult conditions. The disturbance of road and railroad traffic must be reduced to a minimum. The building of the foundations was very difficult. Besides of the building of the new bridge the old bridge must be deconstructed. The interests of the inhabitants of the urban district Schönau had to be respected, because they were disturbed by the site traffic during the whole construction period.
The following paper describes the technical solutions to execute the complex construction process. For a general description of the bridge see [1].

Keywords:
erection fabrication incremental launching demolition hangers manufacture incremental launching technique upset forging fragmentation by blasting steel box girder retreating work
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.201301655.
  • About this
    data sheet
  • Reference-ID
    10067345
  • Published on:
    29/03/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine