Ersatzneubau der Kajen im Marinestützpunkt Wilhelmshaven
Author(s): |
Hinnerk Sunderdiek
Dirk Eickmeyer Ulrich Jäppelt |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, September 2016, n. 9, v. 93 |
Page(s): | 672-677 |
DOI: | 10.1002/bate.201600054 |
Abstract: |
Replacement construction of quays at the naval base in WilhelmshavenAt the naval base of Wilhelmshaven the quay walls and dolphins of a floating bridge system are being renewed. The existing quays show extensive damage and stability deficits. In particular, microbially induced corrosion (MIC) on the back of the old sheet piling lead to rust corrosion of the old sheet pile walls. Content of the report is the conceptual and structural implementation of the measure quay renewal that has been executed since the beginning of 2013. Special attention is paid to the security of the stock during the construction period, the selected corrosion protection measures as well as the requirements for the installation of combined sheet piling. |
Keywords: |
corrosion protection harbor construction intervention on existing buildings sheet piling corrosion prevention microbially induced corrosion construction in existing buildings port engineering
|
Available from: | Refer to publisher |
- About this
data sheet - Reference-ID
10073801 - Published on:
02/10/2016 - Last updated on:
02/10/2016