Erneuerung des Rheinhafens Bendorf
Modernisierung eines über 100 Jahre alten Binnenhafens
Author(s): |
Michael Dormann
Johannes Herbort |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, May 2012, n. 5, v. 89 |
Page(s): | 338-345 |
DOI: | 10.1002/bate.201200017 |
Abstract: |
Renewal of the Rhine-Port Bendorf - Modernization of an over 100-year old inland portIn December the construction work for the renewal of the handling quays in the Rhine-Port Bendorf started. The 80 - 110 years old bank walls will be replaced by a steel sheet piling with a length of 430 m. Also two berths for tankers will be extended by further mooring dolphins and equipped with additional gangways. A 65000 m² area of the harbour floor will be deepened and thus adapted to the improvement of the Middle Rhine. A new flood-proof storage and handling area of about 12000 m² will be created by means of landfills up to 4 m height. These new areas will get a surface with interlocking paving stones and a new drainage system including a rain detention and settling basin. The total work has to be carried out during full harbour operation. Meanwhile the first construction phase of the new sheet piling including the flood-proof area and the extension of the berths are finished, by the end of June 2012 the total work will be completed. Upon completion the Rhine-Port Bendorf will be a modern and efficient inland harbour with clearly improved conditions for the ship's crews and the handling companies. |
Keywords: |
Rhine-Port Bendorf handling quays bank walls steel sheet piling landfills inland port mooring dolphins
|
Available from: | Refer to publisher |
Geographic Locations
- About this
data sheet - Reference-ID
10066792 - Published on:
05/09/2012 - Last updated on:
30/09/2018