EPB tunnelling at the Silvertown Tunnel Project in London
Approach and challenges of the river crossing in mixed‐face conditions
Author(s): |
Alena Conrads
(Wayss & Freytag Ingenieurbau AG Abteilung Tunnelbau Eschborner Landstr. 130-132 60489 Frankfurt)
Oon Hooi Lim (Wayss & Freytag Ingenieurbau AG Abteilung Tunnelbau Eschborner Landstr. 130-132 60489 Frankfurt) Ivor Thomas (BAM Nuttall St James House Knoll Road Camberley GU15 3XW) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Geomechanics and Tunnelling, August 2024, n. 4, v. 17 |
Page(s): | 276-288 |
DOI: | 10.1002/geot.202400009 |
- About this
data sheet - Reference-ID
10784481 - Published on:
20/06/2024 - Last updated on:
20/09/2024