Enhancing BIM Integration: A Comparative Analysis of Novel Composite Structure Documentation Methods
Author(s): |
Dóra Szalai
Kitti Ajtayné Károlyfi |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 19 June 2024, n. 6, v. 14 |
Page(s): | 1817 |
DOI: | 10.3390/buildings14061817 |
Abstract: |
The proper selection and planning of building materials are crucial tasks in architectural design, as they fundamentally impact the functioning of the structure. In traditional design processes, this information is recorded in text form, typically using word processing software. However, this approach hinders the integration with modern, data-driven design methods and is incompatible with the increasingly popular building information modeling (BIM) processes. To address this, two new methods have been developed: one database-like method in the form of an Excel spreadsheet and the other as a dedicated web application. This article introduces and compares these methods based on pilot projects conducted by university students and an expert. Based on the results of the study conducted among students and expert, the database-like method proves to be the fastest. For students, creating a composite structure took an average of 14–20 min, while for experts, it took an average of 1.2 min. According to the evaluation of participants, the traditional method does not facilitate automatic communication with BIM, while both the database and web solutions promote it. The web-based solution, with its dedicated layout and functionality, offers additional advantages in this regard. The research underscores the importance of structured data in BIM and proposes new methods to streamline composite documentation processes during the design phase. |
Copyright: | © 2024 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.38 MB
- About this
data sheet - Reference-ID
10787665 - Published on:
20/06/2024 - Last updated on:
20/06/2024