0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Enhanced heuristic for finance-based scheduling of construction projects

Author(s):

Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 7, v. 33
Page(s): 531-553
DOI: 10.1080/01446193.2015.1063676
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2015.1063676.
  • About this
    data sheet
  • Reference-ID
    10216396
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine