0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Engineer Faces Potential Liability for Contractor's Project Delays

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 5, v. 83
Page(s): 88
DOI: 10.1061/ciegag.0000720
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/ciegag.0000720.
  • About this
    data sheet
  • Reference-ID
    10141598
  • Published on:
    02/12/2018
  • Last updated on:
    19/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine