0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Energy and Environmental Systems Planning with Recourse: Inexact Stochastic Programming Model Containing Fuzzy Boundary Intervals in Objectives and Constraints

Author(s): (MOE Key Laboratory of Regional Energy Systems Optimization, Resources and Environmental Research Academy, North China Electric Power Univ., Beijing 102206, China.)
(MOE Key Laboratory of Regional Energy and Environmental Systems Optimization, Resources and Environmental Research Academy, North China Electric Power Univ., Beijing 102206, China; formerly, Institute for Energy, Environment and Sustainable Communities—En)
(State Key Laboratory of Water Environment Simulation, School of Environment, Beijing Normal Univ., Beijing 100875, China; and Institute for Energy, Environment and Sustainable Communities—Environment Canada, Univ. of Regina, Regina, Saskatchewan S4S 7H9, )
(Resources and Environmental Research Academy, North China Electric Power Univ., Beijing 102206, China.)
Medium: journal article
Language(s): English
Published in: Journal of Energy Engineering, , n. 3, v. 139
Page(s): 169-189
DOI: 10.1061/(asce)ey.1943-7897.0000116
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)ey.1943-7897.0000116.
  • About this
    data sheet
  • Reference-ID
    10588195
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine