0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Employing multi criteria optimisation methods for risk assessment of damage to bridge objects

Author(s):

Medium: journal article
Language(s): English
Published in: Budownictwo i Architektura, , n. 1, v. 12
Page(s): 031-038
DOI: 10.35784/bud-arch.2161
Abstract:

The article presents the possible employment of multiple criteria optimisation methods in the process of evaluating the risk of damage to engineering facilities as a result of terrorist attacks. The subject of the analyses covered selected bridge facilities in the area of Wrocław. The article presents the atypical application of two selected optimisation methods, i.e. the AHP method and the Bellinger’s method. The benefit of the analyses presented is a possible scientific justification for the adopted hierarchy of decision variants.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.35784/bud-arch.2161.
  • About this
    data sheet
  • Reference-ID
    10476139
  • Published on:
    25/11/2020
  • Last updated on:
    25/11/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine