0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction

This publication lists 39 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10155577
  • Published on:
    11/12/2018
  • Last updated on:
    11/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine