Empirical Comparison of Two Methods for the Bayesian Update of the Parameters of Probability Distributions in a Two-Level Hybrid Probabilistic-Possibilistic Uncertainty Framework for Risk Assessment
Author(s): |
N. Pedroni
E. Zio A. Pasanisi M. Couplet |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, March 2016, n. 1, v. 2 |
Page(s): | 04015015 |
DOI: | 10.1061/ajrua6.0000848 |
- About this
data sheet - Reference-ID
10519537 - Published on:
10/12/2020 - Last updated on:
19/02/2021