Background:

Blackouts on high voltage (HV) transmission lines occur due to harsh weather and non-climatic reasons such as human errors and mechanical failures. While it is impossible to prevent all such situations, utility officials and contractors can be equipped to meet such emergencies.

Objective:

This paper discusses: (1) the economic impact of climatic events in the USA and economic justification for having Emergency Restoration (ER) plans and, (2) emergency restoration procedures for downed transmission lines in Oman. Key aspects of emergency restoration procedures are discussed.

Copyright: © 2017 Karthi. K Vadivel
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10175223
  • Published on:
    02/08/2019
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine