Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Green Building, , n. 3, v. 2
Page(s): 79-87
DOI: 10.3992/jgb.2.3.79
Abstract:

The purpose of this experiment was to determine the contaminant load reduction incurred using a constructed wetland with an average hydraulic detention time of five days in treating agricultural runoff. The main contaminants present in the runoff were nitrogen and phosphorus from agricultural fertilizers. The findings of the experiment show that significant contaminant load reduction results can be achieved with a detention time, of as little as five days, in a properly constructed wetland system.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.3992/jgb.2.3.79.
  • About this
    data sheet
  • Reference-ID
    10517476
  • Published on:
    11/12/2020
  • Last updated on:
    19/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine