0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ejecución del dique en la dársena

Author(s):

Medium: journal article
Language(s): Spanish
Published in: Hormigón y acero, , n. 223-226, v. 53
Page(s): 119-137
Abstract:

Execution of the dock in the Crinavis basin

This section covers all aspects of the construction of the dock, including a study of the main factors affecting the execution of the works at the dry dock in Algeciras Bay: ? The Crinavis Basin. ? Site facilities. ? Provisional foundations. ? Execution stages: Division into eight modules ("Plots"). ? Formwork, reinforcement and concrete-pouring. ? Full scale tests. ? Pre-stressing process: cable and reinforcing bar families. ? Special ball joint area (clamping to the concrete).

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10075841
  • Published on:
    25/10/2018
  • Last updated on:
    25/10/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine