0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Eiderdamm Hundeknöll-Vollerwieck (Teil 3)

Dammbau und Baggerarbeiten

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 7, v. 49
Page(s): 219-228, 269-278
Abstract:

Es wird über Anforderungen und die detaillierte Konstruktion des Eiderdammes berichtet.

Keywords:
hydraulic engineering
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10037063
  • Published on:
    23/01/2009
  • Last updated on:
    30/09/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine