The efficient scheduling of resources in engineering construction projects: reflections on a case study from Iran
Author(s): |
David Greenwood
Barry James Gledson |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Management and Economics, August 2012, n. 8, v. 30 |
Page(s): | 687-695 |
DOI: | 10.1080/01446193.2012.704595 |