The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects
Author(s): |
Mary Hardie
Shahed Khan Angela O'Donnell Graham Miller |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Australasian Journal of Construction Economics and Building, November 2007, n. 2, v. 7 |
Page(s): | 26-36 |
DOI: | 10.5130/ajceb.v7i2.2988 |
Abstract: |
Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP) is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
2.67 MB
- About this
data sheet - Reference-ID
10338682 - Published on:
05/08/2019 - Last updated on:
02/06/2021