0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Effects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction

This publication has been cited in the following 29 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10161084
  • Published on:
    07/12/2018
  • Last updated on:
    07/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine