0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Effects of Change Orders through Technical Programs on Construction Projects in Jordan

Author(s):
Medium: journal article
Language(s): English
Published in: Journal of Civil Engineering and Architecture, , n. 11, v. 10
DOI: 10.17265/1934-7359/2016.11.002

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.17265/1934-7359/2016.11.002.
  • About this
    data sheet
  • Reference-ID
    10590778
  • Published on:
    15/03/2021
  • Last updated on:
    15/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine