0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Effects of Change Orders on the Cost and Schedule of Rural Road Maintenance Projects

This publication has been cited in the following 14 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579853
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine