Effect of Risk on Economic Efficiency of Overcladding System
Author(s): |
Ewa Marcinkowska
Mariusz Rejment |
---|---|
Medium: | journal article |
Language(s): | Latvian |
Published in: | Journal of Civil Engineering and Management, September 2006, n. 3, v. 12 |
Page(s): | 247-253 |
DOI: | 10.3846/13923730.2006.9636399 |
Abstract: |
When a decision is taken about assembling an overcladding system on building external walls, an expected profit is calculated according to the economic discounting formulae. However, these formulae do not take into account the unplanned repair costs. The unplanned repairs have to be done to remove the defects which appear on a building wall overcladding during its service life. In order to do that the authors have performed the expert's surveys of technical condition of the existing overcladdings. These overcladdings were assembled on the external walls of 497 apartment buildings located in Wrocław (Poland) in 1990.2000. The qualitative results of technical condition expert's surveys, their transformation into the quantitative values done according to the elaborated model and estimation of the risk related to the expected profit decrease are presented in the article. |
- About this
data sheet - Reference-ID
10363272 - Published on:
12/08/2019 - Last updated on:
12/08/2019