0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Effect of Excavation-Induced Groundwater Level Drawdown on Tunnel Inflow in a Jointed Rock Mass

This publication lists 4 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10675748
  • Published on:
    29/05/2022
  • Last updated on:
    29/05/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine