0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The effect of concession period design on completion risk management of BOT projects

This publication has been cited in the following 15 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10206966
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine