Effect of Clogging on EPB TBM Performance: A Case Study in Akfirat Waste Water Tunnel, Turkey

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Geotechnical and Geological Engineering, , n. 6, v. 37
Page(s): 4789-4801
DOI: 10.1007/s10706-019-00938-6
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1007/s10706-019-00938-6.