0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Effect of Change-Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach

This publication lists 81 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10685736
  • Published on:
    13/08/2022
  • Last updated on:
    13/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine