0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections

This publication lists 30 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10661228
  • Published on:
    23/03/2022
  • Last updated on:
    01/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine