0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Earned value concept analysis on project monitoring (Case study: Faculty of Forestry Universitas Sumatera Utara building construction phase 1)

This publication lists 7 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10674764
  • Published on:
    03/06/2022
  • Last updated on:
    03/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine