0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

An earned-value-analysis (EVA)-based project control framework in large-scale scaffolding projects using linear regression modeling

This publication lists 20 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10690180
  • Published on:
    13/08/2022
  • Last updated on:
    18/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine