Dynamic Probability Analysis for Construction Schedule Using Subset Simulation

Author(s): ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Advances in Civil Engineering, , v. 2021
Page(s): 1-13
DOI: 10.1155/2021/1567261
Abstract:

Schedule management is an essential part of construction project management. In practical management affairs, many uncertainties may lead to potential project delays and make the schedule risky. To quantify such risk, the Probabilistic Critical Path Method (PCPM) is used to compute the overdue probability. Survey shows it could help project managers understand the schedule better. However, two critical factors limited the application of PCPM: computational efficiency and timeliness. To solve these constraints, we combined subset simulation and statistical learning to build a computationally efficient and dynamic simulation system. Numerical experiment shows that this method can effectively improve the computation efficiency without losing any accuracy and outperforms the other approaches with the same assumptions. Besides, we proposed a machine learning-based way to estimate task duration distributions in PCPM automatically. It collects real-time progress data through user interactions and learns the best PERT-Beta parameters based on these historical data. Our estimator provides our simulation system the ability to handle dynamic assessment without laborious human work. These improvements reduce the limitations of PCPM, making the application of PCPM in practical management affairs possible.

Copyright: © Shen Zhang and Xingyu Wang et al.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10630605
  • Published on:
    01/10/2021
  • Last updated on:
    05/10/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine