Dynamic Modeling for Analyzing Cost Overrun Risks in Residential Projects
Author(s): |
Ghada Taha
Ali Sherif Mohamed Badawy |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, September 2022, n. 3, v. 8 |
DOI: | 10.1061/ajrua6.0001262 |
- About this
data sheet - Reference-ID
10689590 - Published on:
13/08/2022 - Last updated on:
13/08/2022