Duration Estimation of a Heavy Industrial Scaffolding Project: A Case Study
Author(s): |
Samira Rizaee
Zhen Lei |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, April 2024, n. 4, v. 150 |
DOI: | 10.1061/jcemd4.coeng-13915 |
- About this
data sheet - Reference-ID
10758383 - Published on:
15/03/2024 - Last updated on:
15/03/2024