0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Duration Estimate at Completion: Improving Earned Value Management Forecasting Accuracy

This publication has been cited in the following 3 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10412259
  • Published on:
    13/02/2020
  • Last updated on:
    25/02/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine