0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Dual-objective control of braced steel frame using asynchronized parallel two-stage yielding BRB

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1016/j.soildyn.2024.108522.
  • About this
    data sheet
  • Reference-ID
    10760053
  • Published on:
    15/03/2024
  • Last updated on:
    15/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine