0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A dual-adaptive directed genetic algorithm for construction scheduling

This publication lists 47 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10817695
  • Published on:
    03/02/2025
  • Last updated on:
    03/02/2025
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine