0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Driving and Lining of the Clunie Tunnel on the Tummel-garry Hydro-electric Project

Author(s):
Medium: journal article
Language(s): English
Published in: The Institution of Civil Engineers Engineering Division Papers, , n. 14, v. 8
Page(s): 1-17
DOI: 10.1680/idivp.1950.12797
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/idivp.1950.12797.
  • About this
    data sheet
  • Reference-ID
    10264300
  • Published on:
    18/01/2019
  • Last updated on:
    18/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine