0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Dispute Resolution and Contract Incentives: Perceptions of Project Stakeholders

Author(s): (Graduate Student, Dept. of Construction Management, Colorado State Univ., Fort Collins, CO 80523-1584.)
(Assistant Professor, Dept. of Construction Management, Colorado State Univ., Fort Collins, CO 80523-1584 (corresponding author).)
(Associate Professor, Dept. of Construction Management, Colorado State Univ., Fort Collins, CO 80523-1584.)
(Associate Professor, Dept. of Construction Management, Colorado State Univ., Fort Collins, CO 80523-1584.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 9
Page(s): 04517019
DOI: 10.1061/(asce)la.1943-4170.0000243
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000243.
  • About this
    data sheet
  • Reference-ID
    10579872
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine