Displacement characteristics of high-speed railway tunnel construction in loess ground by using multi-step excavation method
Author(s): |
Pengfei Li
Yong Zhao Xiaojun Zhou |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Tunnelling and Underground Space Technology, January 2016, v. 51 |
Page(s): | 41-55 |
DOI: | 10.1016/j.tust.2015.10.009 |
Structure Types
- About this
data sheet - Reference-ID
10089912 - Published on:
07/12/2018 - Last updated on:
07/12/2018