Direct and Indirect Costs of Change Orders
Author(s): |
Daniel Duah
M. G. Matt Syal |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Practice Periodical on Structural Design and Construction, November 2017, n. 4, v. 22 |
Page(s): | 04017025 |
DOI: | 10.1061/(asce)sc.1943-5576.0000342 |
- About this
data sheet - Reference-ID
10232648 - Published on:
02/12/2018 - Last updated on:
02/12/2018