Devising an Organized Procedure for Effective Risk Management in Independent Water and Power Plant Projects in Saudi Arabia
Author(s): |
Yousef Saad Alsulaiman
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Civil Engineering and Architecture, December 2015, n. 12, v. 9 |
DOI: | 10.17265/1934-7359/2015.12.001 |
- About this
data sheet - Reference-ID
10590645 - Published on:
15/03/2021 - Last updated on:
15/03/2021