0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/10286600600789375.
  • About this
    data sheet
  • Reference-ID
    10191902
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine