既製コンクリート杭・高支持力埋め込み杭工法 (ハイビーエム工法) の開発 (Development of High Beaing Capacity Embedded Piling Method (H.B.M. Method) Utilising Prefabricated Concrete Piles)
Author(s): |
K. Tsuda
|
---|---|
Medium: | journal article |
Language(s): | Japanese |
Published in: | Concrete Journal (JCI), 2003, n. 10, v. 41 |
Page(s): | 15-23 |
DOI: | 10.3151/coj1975.41.10_15 |
- About this
data sheet - Reference-ID
10440100 - Published on:
08/10/2020 - Last updated on:
08/10/2020