0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of Emergency Track Beam Alignment for Rapid Track Beam Replacement of Straddle Monorail Transit

Author(s): (Ph.D. Candidate, School of Civil Engineering, Beijing Jiaotong Univ., No. 3 Shang Yuan Cun, Hai Dian District, Beijing, China.)
(Professor, School of Civil Engineering, Beijing Jiaotong Univ., No. 3 Shang Yuan Cun, Hai Dian District, Beijing, China (corresponding author).)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 4, v. 139
Page(s): 416-423
DOI: 10.1061/(asce)te.1943-5436.0000497
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)te.1943-5436.0000497.
  • About this
    data sheet
  • Reference-ID
    10635521
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine