Development of Benchmarks for First and Last Mile Connectivity of a Metro Rail System Through Performance Evaluation: A Case Study of Mumbai Metro Line 1
Author(s): |
Pradeep Chaitanya Jasti
V. Vinayaka Ram |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of The Institution of Engineers (India): Series A, July 2024, n. 3, v. 105 |
Page(s): | 533-546 |
DOI: | 10.1007/s40030-024-00823-3 |
- About this
data sheet - Reference-ID
10792172 - Published on:
01/09/2024 - Last updated on:
23/09/2024