0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method

This publication lists 112 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10784345
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine