0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Development of a Delay Model for Roundabouts in Jordan

Author(s): (Associate Professor of Civil Engineering and Vice Dean of Research, Jordan Univ. of Science and Technology, P.O. Box (3030), Irbid, Jordan.)
(Professor of Civil Engineering, Vice Dean of Engineering Faculty, Jordan Univ. of Science and Technology, P.O. Box (3030), Irbid, Jordan.)
(Teaching Assistant, Civil Engineering Dept., Hashemite Univ., Zarqa, Jordan.)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 1, v. 130
Page(s): 76-82
DOI: 10.1061/(asce)0733-947x(2004)130:1(76)

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(2004)130:1(76).
  • About this
    data sheet
  • Reference-ID
    10634467
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine