Development and testing of precast concrete-filled square steel tube column-to-RC beam connections under cyclic loading
Author(s): |
Yue Zhang
Dongsheng Li |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction and Building Materials, April 2021, v. 280 |
Page(s): | 122540 |
DOI: | 10.1016/j.conbuildmat.2021.122540 |
- About this
data sheet - Reference-ID
10684545 - Published on:
17/06/2022 - Last updated on:
17/06/2022